This project required from LareiARTE a supply of about 5000 m2 of the finished product.
Were provided sills, thresholds, ventilated facades, wall coverings, floors and stairs.
Were also recovered 1000 ml of sills on field.
Main materials: Ataíja Cream, Azul Valverde and Lioz Abancado.
Consumption conflicts
Copyright © LareiArte 2018 Development and Design : |